Collection: Ground Mounts for Solar Panels

Direct answer: Ground mounts put the array on a pipe or rack beside the building when the roof is shaded, overloaded, oddly oriented, or under warranty limits. This leaf stocks IronRidge pipe hardware (GM-BRC2 / GM-BRC3 bonded rail connectors and diagonal brace parts); Schedule 40 pipe is usually sourced locally, and XR rails / UFO clamps live on Solar Panel Mounts. Call 877-878-4060 with module count and site photos — DIY and pro installers since 1999.

Ground mounts put the solar array on a pipe or rack structure beside the building instead of on the roof. Shoppers choose ground mounts when the roof is shaded, overloaded, oddly oriented, under warranty limits, or when open land lets you aim the array for better production. Start with the parent solar panel mounts hub for rails and clamps, then use this leaf for IronRidge ground-mount pipe hardware.

In stock now (IronRidge ground-mount hardware): bonded rail connectors for 2" and 3" Schedule 40 pipe (GM-BRC2 / GM-BRC3) and diagonal brace hardware (GM-DB-HW01). Schedule 40 pipe is usually sourced locally; top caps, rails, UFO clamps, and brace kits complete the BOM. Inventory rotates — call 877-878-4060 with module count, site photos, and soil notes so we can confirm a bill of materials before you order.

When a ground mount beats a roof mount

  • Shade or poor roof orientation — place the array where the sun actually hits, not where the roof faces.
  • Roof structure or warranty limits — avoid penetrations or loads the deck cannot take; metal roofs may still be fine with the right metal roof mounts.
  • Large open yards / fields — ground racks scale cleaner for bigger arrays and easier service access.
  • Tilt optimization — IronRidge ground mounts support a wide tilt range via the Design Assistant so you can trade structure cost vs annual kWh.

Roof still wins when the deck is strong, unshaded, and correctly oriented — browse roof mounts and metal roof mounts first in that case.

IronRidge ground-mount stack (what you order)

  • Pipe structure — Schedule 40 steel pipe (2" or 3") sourced locally for legs and cross members.
  • Top caps + rail connectors — connect pipe to XR rails; bonded connectors (GM-BRC2 / GM-BRC3) secure and bond the rail to the pipe.
  • XR rails + UFO mid/end clamps — hold and bond the modules (see mounts hub).
  • Brace hardware — diagonal brace kits when wind/snow or span needs extra support.
  • Design Assistant — walk soil, tilt, and module size in IronRidge's tool (steps preserved below) before locking the BOM.

What to buy with ground mounts

Shop related gear

FAQ

Do I need a full IronRidge ground-mount kit on this page?

This leaf currently lists the IronRidge pipe hardware we stock (rail connectors and brace hardware). Most projects also need Schedule 40 pipe (local), top caps, XR rails, and module clamps from the mounts hub. Call 877-878-4060 with module count and site notes for a complete BOM.

2" vs 3" Schedule 40 pipe — which should I use?

Pipe size follows IronRidge Design Assistant output for span, snow/wind, and module layout. Match bonded rail connectors to the pipe you choose (GM-BRC2 for 2", GM-BRC3 for 3"). Do not mix connector size and pipe size.

Ground mount vs metal roof mount — how do I decide?

Use a metal roof mount when the roof is strong, unshaded, and warranty-friendly. Choose a ground mount when shade, orientation, roof load, or access makes the yard the better array location. Call 877-878-4060 with roof and site photos if you are deciding.

Can I use the IronRidge Design Assistant?

Yes — the steps and tool link below walk soil conditions, tilt, rails, clamps, top caps, and braces. Bring that output when you call so we can confirm what is in stock versus sourced locally.

Can altE help size a ground-mount BOM?

Yes. Share module model/count, site photos, soil/frost notes, and target tilt. Call 877-878-4060 — DIY and pro installers since 1999.

Questions about ground mounts, IronRidge pipe hardware, or a full racking bill of materials? Call an altE specialist at 877-878-4060 — DIY and pro installers since 1999.

IronRidge ground-mount hardware for pipe racks — bonded rail connectors and brace parts — so you can place the array where sun and structure allow, not only where the roof faces.

Need help choosing ground mounts?

Ground Mounts for Solar Panels

1) Click on the IronRidge Design Assistant Tool for Ground Mounts..

2) Choose your XR 1000 Rail:

XR1000 Rail XR Rail Thumbnail Image

  • Heavyweight mounting rail for ground mounts
  • Up to 12' spanning capability
  • Extreme load capability

3) Choose the appropriate Clamps & Grounding:

Midclamps Midclamp Thumbnail Image

  • Universal Fastening Object UFO
  • Bonds the modules to the rails

Endclamps Endclamp Thumbnail Image

  • Stoppers snap onto a UFO
  • Turns into a bonded endclamp
  • Sized to module frame width
  • NEW- CAMO Universal Endclamp fits all modules

Grounding Grounding Thumbnail Image

  • Only one grounding lug per row
  • Microinverter bonding kit
  • Grounding strap, rows over 50ft

4) Source locally the 2" or 3" Schedule 40 Steel Pipe, and choose the appropriate Top Caps and Rail Connectors:

Top Cap Ground Mount Top Cap Thumbnail Image

  • Heavy duty cast steel
  • Secures quickly and easily to Schedule 40 Pipe
  • Connects vertical and cross pipes

Rail Connector Rail Connector Thumbnail Image

  • Bonded connectors with hardware
  • 2 connectors per rail, secures and bonds the rail to the pipe


5) Need extra support? Choose the appropriate Brace Assembly Kit:

Brace Assembly Ground Mount Brace Kit Thumbnail Image

  • 2 pipe sleeves, diagonal brace, hardware
  • Only needed for installations requiring add'l support

Diagonal BraceGround Mount Brace Kit Thumbnail Image

  • Pieces include the brace, sleeves, and hardware for installation between one north and south pair of support legs

See our Video with IronRidge as we cover the basics of their SGA ground mount solution.